| |
Business Type |
Manufacturer
,
Exporter , Supplier & Service Provider |
Capital in Rupees |
Rs. 90 lakh |
Primary Competitive Advantages |
- Unparalleled quality of products
- Timely delivery
- Affordable prices
- Sophisticated manufacturing set up
- Stringent quality checks
- Customized products
|
Sales Volume |
Rs. 90 lakh |
No of Staff |
11-25 People |
Year of Establishment |
2002 |
No of Production Lines |
6 |
Investment on Manufacturing Equipment |
Rs. 10 lakh |
No of Engineers |
2 |
Product Range |
Coolant Filtration Equipment: Hydro Band Filter, Double Disc Filter, Paper Band Filter Gravity
Filters, Vacuum Filters, Magnetic Separators, Pressure Filters, Oil
Skimmer, Chip Conveyor Scraper Type, Chip Conveyor Hinged Belt Type,
Chip Conveyor Screw Type, Chip Conveyor Drum Type.
Coolant Filtration Media: Dual
Layer Lofts, Both Multi-layer and Spun-bonded Polypropylenes, Flat and
Point Bonded Polyesters, Rayon’s and Polyester Cellulose…etc.
Engineered Systems: Total
system engineering of Coolant Filtration Systems that includes
Conveyorized Tanks, Reservoir Tanks, Piping, Pumps, Pump Bases, Heat
Exchangers, Transfer Pumps, Control Panels and Level Indicator. |
Services Offered |
We
render extensive service and support for our equipment, including
Technical Manuals, Spare Parts, Filter Media, Preventative Maintenance
Program and Onsite Start-up Service Technician Support.
- Filter Media
- Preventative Maintenance
- Spare Parts
- Start-up Service Technician Support
- Technical Manuals
- Application Feasibility Testing
Preventative Maintenance:
We
offer a preventative maintenance program to customers to ensure that
equipment marked with the trust seal of Udly Engineers operate to design
specifications.
Start-up Service Technician Support:
We
have with us qualified service technicians who help us offer Start-up
Service Support for our offered Equipment. This service is standard with
many systems and is provided at a very nominal service fee. Our field
service technicians provide installation troubleshooting, operator
training, start-up and flow balancing of the system. Please schedule
start-up service at least 3-weeks prior to start-up to insure
availability of service technician. |
|
|
|
| | | |
|